SAP C_TS422_2021 certification exam is designed to validate the skills and knowledge of individuals who are responsible for planning and managing production processes in the SAP S/4HANA system. SAP Certified Application Associate – SAP S/4HANA Production Planning and Manufacturing 2021 certification is targeted towards professionals who work as application consultants, business analysts, or project managers, and have a thorough understanding of the production planning and manufacturing components of the SAP S/4HANA system.

 

Q40. Which standard item categories can you select inside a bill of material (BOM)? Note: There are 2 correct answers to this question.

 
 
 
 

Q41. What do you use to dispatch operations from planned orders so that the production plan can be fulfilled?

 
 
 
 

Q42. What is the purpose of a reporting point confirmation in repetitive manufacturing?

 
 
 
 

Q43. Your proyect team decides to use a make-to-order planning strategy for strategic in discrete manufacturing.
What is the impact of this decision?

 
 
 
 

Q44. Which information is required when you created a production master in SAP S/4HANA?

 
 
 
 

Q45. What type of time element can be reduced by strategy settings while dispatching?

 
 
 
 

Q46. How can you carry out cost object controlling for production orders?

 
 
 
 

Q47. Your project used process orders for the production of liquid chemicals.
What can you define to ensure that the production flow happens only in physically connected tanks?

 
 
 
 

Q48. Where do you maintain data to determine the duration of an operation for production?

 
 
 
 

Q49. Which SAP application can be used for forcasting in Supply Chain Planning?

 
 
 
 

Q50. You need to model goods receipt processing time in detailed scheduling. Whic modeling options do you have?

 
 
 
 

Q51. You are working with planning strategy 40 (Planning-with-final assembly) When does consuption of planned independent requirements take places?

 
 
 
 

Q52. During production order creation, several valid production versions are found. How does the system choose the production version?

 
 
 
 

Q53. Which SAP solutions support the supplier area in the portfolio of the Digital Value Network?

 
 
 
 
 

Q54. Why would you use phantom assemblies?

 
 
 
 
 

Q55. Which time elements are part of a routing operation?

 
 
 
 
 

Q56. You have maintained the parameters for simple discontinuation in the material master of a component. Which business process will be affected if the available stock is zero and the discontinuation date is in the past?

 
 
 
 

Q57. In the Capacity Scheduling Table, which settings can you select for the planning strategy? Note: There are 3 correct answers to this question.

 
 
 
 
 

Q58. You have a schedule agreement whit a vendor. You want classic MRP to automatically create schedule lines in case of material shortage.
What must you do?

 
 
 
 

Pass SAP With ActualTorrent Exam Dumps: https://www.actualtorrent.com/C_TS422_2021-questions-answers.html

Related Links: myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt

Be the first to reply

Leave a Reply

Your email address will not be published. Required fields are marked *

Enter the text from the image below