Q315. Carrying can be broken down into which of the following three categories?

 
 
 
 

Q316. End-of-line inspection often fails to improve quality for which of the following reasons?

 
 
 
 

Q317. Master scheduling tries to level capacity and just-in-time tries to level the schedule based on capacity and material flow.

 
 

Q318. The quantity on hand plus the quantity ordered must equal the sum of the demand during the lead time plus the demand during the review period plus safety stock.

 
 

Q319. Knowing the quantity beyond which the cost of using method B becomes less than for method A enables us to decide easily which process to use to minimize the total cost, this quantity is called:

 
 
 
 

Q320. When a calculation is made to find out how many are needed, the quantities available must be considered in:

 
 
 
 

Q321. Which of the following points are related to bills of material?

 
 
 
 

Q322. is a two-step process. First determine the time needed for each order at each order at each work center. Then sum up the capacity required for individual orders?

 
 
 
 

Q323. Which of the following plant is used in the production process, where few raw materials can be made into several end products?

 
 
 
 

Q324. Demonstrated capacity is average, not maximum, output and depends on the utilization and efficiency of work center.

 
 

Q325. A work center consists of 4 machines each working a 16-hour day for 5 days a week. What is the weekly available time?

 
 
 
 

Q326. A manufacturer has the alternative of making parts in-house or of buying them from an outside supplier. Reason/s to buy out may be:

 
 
 
 

Q327. What have most of the values clustered near a central point with progressively fewer results occurring away from the cluster?

 
 
 
 

Q328. Materials should be moved from point of manufacture to point of use when:

 
 
 
 

Q329. Planning file/s needed for the production activity control is/are:

 
 
 
 

Q330. The group works together to develop the product design so it meets the needs of the customer and can be made and delivered to the customer at low cost in a process called:

 
 
 
 

Q331. Inventory Record is one of the major input to the

 
 
 
 

Q332. The number of time an item is counted in a year is called its count frequency.

 
 

Q333. ERP systems:

 
 
 
 

Q334. Which of the following is the characteristic to flow manufacturing?

 
 
 
 

Q335. When in a given period, actual demand will vary about the average demand, this is called:

 
 
 
 

APICS CPIM certification exam is ideal for professionals who are looking to enhance their knowledge and skills in the field of production and inventory management. Certified in Production and Inventory Management certification is suitable for individuals who are involved in the planning, sourcing, manufacturing, and delivery of products, as well as those who are responsible for managing inventory levels and ensuring that production processes are efficient and effective. Certified in Production and Inventory Management certification is also suitable for individuals who are looking to advance their careers in supply chain management.

 

Best way to practice test for APICS CPIM: https://www.actualtorrent.com/CPIM-questions-answers.html

Related Links: myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt

Be the first to reply

Leave a Reply

Your email address will not be published. Required fields are marked *

Enter the text from the image below