Updated AVIXA CTS Dumps – Check Free CTS Exam Dumps (2026) [Q75-Q97]

Rate this post

Updated AVIXA CTS Dumps – Check Free CTS Exam Dumps (2026)

Updated CTS exam with AVIXA Real Exam Questions

AVIXA CTS Exam Certification Details:

Passing Score 350 / 500
Exam Code CTS
Non-Member Exam Price $475(USD)
Schedule Exam Pearson VUE
Duration 150 mins
Sample Questions AVIXA CTS Sample Questions
Number of Questions 110
MemberExam Price $375(USD)

 

QUESTION 75
What is the MAIN difference between OLED displays and LED displays?

 
 
 
 

QUESTION 76
A crucial part of the bid (tender) process is the request for clarification. At what point in the bid (tender) process would a potential bidder submit a request for clarification?

 
 
 
 

QUESTION 77
System performance verification occurs when the system is

 
 
 
 

QUESTION 78
As a project manager, daily or weekly updates from the____are MOST USEFUL when trying to make sure a job comes in on time and on budget.

 
 
 
 

QUESTION 79
A client with an open concept office space has stated a concern regarding speech privacy for workers. A possible solution for this issue is a(n)

 
 
 
 

QUESTION 80
A client requests for a project to be completed earlier than initially scheduled. What should the AV contractor do FIRST to address this change?

 
 
 
 

QUESTION 81
Determining the expectations of the end users of a presentation space is called a(n):

 
 
 
 

QUESTION 82
During a site survey, a sound pressure level (SPL) meter can be used for measuring

 
 
 
 

QUESTION 83
What should be identified during a project’s needs analysis?

 
 
 
 

QUESTION 84
What key specification of an owner furnished credenza will a technician need to know that may impact the warranty of the AV equipment?

 
 
 
 

QUESTION 85
The circuit on the RIGHT is an electrical drawing of what type of speaker system?

 
 
 
 

QUESTION 86
A customer wants to reuse existing network cabling to extend audio and video signals in a system refresh.
What is the PRIMARY concern?

 
 
 
 

QUESTION 87
When evaluating site conditions for an AV project that requires a free-standing rack that is 49 RU or taller, the condition that will force assembly on site instead of building the rack in the shop and delivering it fully assembled is when the:

 
 
 
 

QUESTION 88
Which drawing represents a Reflected Ceiling Plan (RCP)? Please click anywhere on the correct image.

QUESTION 89
Which of the following testing metrics would BEST be applied towards testing a distributed audio system for proper speaker wattages and cabling?

 
 
 
 

QUESTION 90
Which of the following meters measures the light coming directly from a source?

 
 
 
 

QUESTION 91
A schedule is being created for a project. Which of these factors will have the MOST impact on the calculations?

 
 
 
 

QUESTION 92
Constant voltage distributed audio systems utilize a_____wiring scheme.

 
 
 
 

QUESTION 93
Identify the cable which is LEAST susceptible to electromagnetic interference. Select the appropriate cable by clicking anywhere on the correct cable.

QUESTION 94
When the customer says: “The PA is only for speech reinforcement!”, which of the following pieces of equipment is most likely NOT needed?

 
 
 
 

QUESTION 95
Identify the portion of the connector that carries the signal. Select the answer by clicking anywhere on the correct part of the connector.

QUESTION 96
Company information, statement of work, drawings, and bill of materials are presented to the customer as what set of documents?

 
 
 
 

QUESTION 97
Given this system information:

What is the MINIMUM current requirement (assuming 110VAC electrical supply)?

 
 
 
 

AVIXA CTS Exam Syllabus Topics:

Topic Details
Topic 1
  • Servicing AV Solutions: This section of the exam measures the skills of AV maintenance managers and focuses on the maintenance and repair of AV solutions. It involves supervising AV operations, conducting preventative maintenance, performing firmware and equipment upgrades, and troubleshooting and repairing AV systems to ensure they remain functional and efficient.
Topic 2
  • Supporting AV System Operation: This section of the exam measures the skills of AV support specialists and covers the ongoing support of AV systems. It includes troubleshooting issues, providing remote assistance, supporting live events, and offering in-room operation training to ensure smooth system operation.
Topic 3
  • Creating AV Solutions: This section of the exam measures the skills of AV system designers and covers the process of creating audiovisual solutions. It includes conducting customer needs analysis, performing site surveys to assess environmental factors like lighting and acoustics, developing project scopes, and designing AV solutions with detailed drawings and materials lists.
Topic 4
  • Implementing AV Solutions: This section of the exam measures the skills of AV system integrators and focuses on the implementation of AV solutions. It involves integrating AV systems, verifying their functionality, and managing the integration process, including training, documentation, and ensuring operational readiness.

 

Actual CTS Exam Recently Updated Questions with Free Demo: https://www.actualtorrent.com/CTS-questions-answers.html

Related Links: myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt

Be the first to reply

Leave a Reply

Your email address will not be published. Required fields are marked *

Enter the text from the image below